Interstate 25 Southbound Lanes: Pueblo, CO

DUE TO DETERIORATION OF THE UNDERLYING PAVEMENT, THIS HFS INSTALLATION WAS REMOVED DURING THE MILLING AND RE-PAVING OF THE UNDERLYING ASPHALT PAVEMENT

Site Information

Site Location: Interstate 25, Pueblo, CO (milepost 97.75-97.9)

Highway Description: Four-lane median-divided Interstate highway

Pavement Type:  Hot-mix asphalt

Approximate AADT:  52,600

I-25 Southbound Site Location

I-25 Southbound Site Location

Installation Details

Installation Date(s):  September 14 (inside lane) and 15 (outside lane), 2009

Installation Timeframe: 8 am – 5 pm

Length of Installation:  550 ft (2 lanes)

Total Area:  1,467 SY